Showing posts with label research and planning. Show all posts
Showing posts with label research and planning. Show all posts
Monday, 4 December 2017
Sunday, 3 December 2017
Saturday, 2 December 2017
Friday, 1 December 2017
Research and planning the CD / DVD cover and advert
Research and planning should include:
- Case studies (individual work): I need to find three examples of current CD digipacks for existing music promos of similar genres/styles to your own video as well as three accompanying magaziqne adverts for similar digipaks. Tinfogram / Prezi / google slides/maze / another tech of your
- I need to also Produce mock-ups of the advert and the cover. These should include the use of taglines, cover lines, images and promotional methods. Each member of the group should produce their own mockups, although it is advisable to decide on a house style together.
Wednesday, 1 November 2017
Saturday, 14 October 2017
Meeting and Establishing dance choreography to other dancers
Today I decided to hold a meeting with the dancers and Artist. Within the meeting, I am going to introduce the cast to each other which enables filming to be more productive and it also removes the nerves that others may have with acting and dancing in front of each other and the crew.
- Introduce cast
- fill them in on the different location, concept and dancing
- showcase their dancing to each other
- finalise group dances
- establish costumes needed
- finalise shooting days in order to make sure the day is convenient for everyone
I contacted everyone individually first, so I can inform them about the meeting. next, I confirmed the meeting date and time on the group chat via snapchat. The meeting was productive as I was able to sort out the dance and clarify most of the dance. The next meeting that will take place is with Levi (ty) and Ruth (girlfriend) as I am going to start filming scenes after I brief them. To conclude, I provided each individual with a brief which clarified the days they need to be available to shot.
Friday, 13 October 2017
Teachers comments on blog
Thursday, 12 October 2017
ORGANISE MY USB FOR THE FILMING: PRE- PRODUCTION

Today in the lesson I organised my USB in preparation for the music video filming. I created a folder called music video footage. The fact that all the work is in one folder makes it easier for me to edit and easy to locate files. Secondly, I created 4 other folders which are named after the location that I am going to film at. An advantage of using this method to organise is that the files will not be mixed up and hard to find where I filmed as after each day of shooting I will organise and sort each individual file into the right location
Wednesday, 11 October 2017
GROUPCHAT: SNAPCHAT
The screenshots show me organising and asking for the availability of the dancers and actors. Furthermore, I explained whats happening in regards to meeting and filming the music video. The information I gathered helped decide which days to film the dancers with the main artist as well as film with just the artist.
Tuesday, 10 October 2017
TESTING OUT LIGHTING: 0103-EB PORTABLE SITE LIGHT 220-240V
The second light that I used was the 0103-EB PORTABLE SITE LIGHT 220-240V. The light is used at building sites in order to illuminate the surrounding area. The light needs a generator or plug socket in order to be powered. A disadvantage of the light is that it is only portable to a certain extent and always relies on the plug which becomes an issue when I am filming in Soho and Waterloo.
I used the light in the classroom with the blinds down to see the extent of light that filled the room. The light is powerful and filled majority of the room however it created shadows. Shadows will create issues within the shot and it will look unprofessional.
Monday, 9 October 2017
Copyright clearance: Pre-Production
Definition: Copyright Clearance. Clearing copyright means the act or process by which a person ensures a proposed use of materials is in compliance with copyright law.
In order to ensure that I am able to use the song for the music video, I emailed the record label and explained that I am a student from Leyton Sixth Form who is creating a music video. I decided to email ovo sound record and I am currently waiting for a response.
Sunday, 8 October 2017
CHOREOGRAPHY : Pre-Production
The choreography is the sequence of steps and movements in dance or figure skating, especially in a ballet or other staged dance. Whilst creating the dance I watched dance videos in order to gather inspiration for my music video as well as adopt specific dance steps. The video shows the main artist TY recreating the beginning steps for the video as it focuses on him solely.
videos that I got inspiration from:
- Kranium - Can't Believe ft. Ty Dolla $ign & WizKid (Dance Video):https://www.youtube.com/watch?v=pWx-_7V24Yc
- Spice - So Mi Like It | K.O & Jason Facey Choreography:https://www.youtube.com/watch?v=IouRmFsmqq0
- Singing In The Rain - Singing In The Rain (Gene Kelly): https://www.youtube.com/watch?v=D1ZYhVpdXbQ
Saturday, 7 October 2017
CALL SHEET WATERLOO: Pre-Production
Call Sheet : Waterloo Station
Production: Signs
|
|||||||
Director:
Tre Mitchel Bailey-Maynard
|
|||||||
Crew
Call: 17:00
Estimated
wrap: 22:00
|
Shooting
Date:30th -5th november
|
||||||
Location: Waterloo Station
Location
contact: 0750881941
|
|||||||
Way
|
|||||||
SET
|
*SCENES
|
PAGES
|
CAST
Nos
|
LOCATION
|
|||
-16,17,18
|
-
|
Waterloo
Station
|
|||||
NO.
|
ARTISTE
|
CALL TIME
|
MAKE-UP
|
REMARKS
|
|||
1
|
Levi
|
-
|
N/A
|
Own
transport to location
|
|||
2
|
Alisha
|
-
|
N/A
|
Own
transport to location
|
|||
3
|
Jessica
|
-
|
N/A
|
Own
transport to location
|
|||
4
|
Antonia
|
-
|
N/A
|
Own
transport to location
|
|||
CAMERA /
LIGHTING
|
PROPS /
DESIGN
|
||||||
Natural
Lighting
Camera-
DSLR including Tripod
lights
|
phone
|
||||||
COSTUME /
MAKE UP
|
CATERING
|
||||||
Levi- blue jeans, white tops and red tracksuits
Dancers:viberant tops
|
Water will
be provided
|
||||||
NOTES:
|
|||||||
We will
include frequent breaks and assessing of footage to reach our standards of
satisfacton
Bring the
lighting in order to show faces.
|
|||||||
CALL SHEET: 36 SHACKLETON WAY
Call Sheet : 36 Shackleton Way
Production: Signs
|
|||||||
Director:
Tre Mitchel Bailey-Maynard
|
|||||||
Crew
Call: 17:00
Estimated
wrap: 22:00
|
Shooting
Date: 23rd -29th October
|
||||||
Location: 36 shackleton
Location
contact: 0750881941
|
|||||||
Way
|
|||||||
SET
|
*SCENES
|
PAGES
|
CAST
Nos
|
LOCATION
|
|||
-1,2,3,4,14,19,20,21,22,23,24,25,26,27,28,29,30,37,38,39,40,41
|
-
|
36
Shackleton way, London
|
|||||
NO.
|
ARTISTE
|
CALL TIME
|
MAKE-UP
|
REMARKS
|
|||
1
|
Levi
|
-
|
N/A
|
Own
transport to location
|
|||
2
|
Alisha
|
-
|
N/A
|
Own
transport to location
|
|||
3
|
Jessica
|
-
|
N/A
|
Own
transport to location
|
|||
4
|
Antonia
|
-
|
N/A
|
Own
transport to location
|
|||
5
|
Tiani
|
-
|
N/A
|
Own transport
to location
|
|||
CAMERA /
LIGHTING
|
PROPS /
DESIGN
|
||||||
Natural
Lighting
Camera-
DSLR including Tripod
lights
|
Roses
Blue bulb
phone
|
||||||
COSTUME /
MAKE UP
|
CATERING
|
||||||
Tiani- jeans, dress and blue jacket
Levi- blue jeans, white tops and red tracksuits
|
Water will
be provided
|
||||||
NOTES:
|
|||||||
We will
include frequent breaks and assessing of footage to reach our standards of
satisfacton
Bring the
lighting in order to show faces.
|
|||||||
Subscribe to:
Posts (Atom)



